Archive for May, 2009|Monthly archive page
Teamwork 4.2.9650 released
This is a major release, the first of the 4.2 series; it is a free upgrade to all users of version 4. The main features of this significant release are:
- Usability improvements: these are documented in detail in this blog post:http://blog.twproject.com/2009/05/13/usability-game-mechanics-teamwork
(actually even more than what described there has been done along this line: just try it out…)
- An empowered meeting management section
- Two new interface translations: in French, and in Chinese
- Several tool expansions for the power users, on automatic advancements, code generations, test status on issues etc. (this is detailed in the following)
- A new skin: ulm
The user guide has been updated. Download the release here; the installer will upgrade your web application and the database schema and data; remember to do backups!
General features
- Added “test” status to issues
- Improved Portuguese translation
- Added option in config for setting task progress to 100% when complete
- Added option in config for generating task codes from types
- Saved filters are visible in the button bar
- Costs are in currency in all the interface
- Easter is not mandatorily a holiday
- Avoid to duplicate subscriptions when present on parents
- Subscribe overdue tasks
- There is task name in the subject of email generated by TW?
- There is a new “ulm” skin, really pretty
-
Usability
- There are “tags” everywhere for tagging and then finding anything
- Assigning a task: create resources on the fly if you have permissions, and put a link in message bar
- The issue in line editor is easy to edit, and to jump from there to entities
- Save on issue line magically appears – no need to press “tab”
- Unassigned resources can be set on issues
- Messages on save and every action are really visible
- Set a default color on resource so that say notification stickies from different assignees are in different colors
- Worklog week: allow add more the one record per day without reloading the page
- A new “first start” starting page
- Badges as balloons for users
Meeting
- Discussion points have been empowered, and are edited in the same page as the supporting calendar event
- Now there is a minute for every discussion point
- Every discussion point can be printed separately
- Issues can be added by simply selecting text of the minute
Bug fixes
- Boards: manage the z-order correctly
- Bug in computing difference in worklog week
- Bug in saving names of default filters
- 3rd level task ordering alphabetical not by task number (after selecting task)
- Document: double save “upload” boom!
- In worklog analysis “move all 796 work logs to selected assignment:” covers the “total” bottom line
- Icons of menu never reloaded
- Summa bug on docs
- Must put operational role on the resources created on the fly
- On chrome: issue list, change a description, press search button, do not leave the page, save the issue, press search again does not work
- Priority not set on assignments created by project tree or issues
Notes on usability, game mechanics, and Teamwork’s evolution
Introduction
The work documented in this post was ignited by receiving the first video tests from usertesting.com and other sources (by the way, Usertesting supplied valuable feedback for a very cheap price), and about at the same time watching a video where Amy Jo Kim from Shufflebrain does a great and inspiring presentation showing how some game mechanics are used by successful social software.
Motivation
Teamwork 4 was realized after studying several texts on usability, and even inventing new techniques, see for example
Smarter search and recent object functionality
Managing with lists vs. managing with trees
But our internal speculations lacked the ideas that may come from an independent fresh look; we received a lot of positive feedback from new users of Teamwork 4, but the problem is that those that do not understand your software, don’t usually give you feedback. So we submitted Teamwork 4.1 to several testers that were first-time users. Then, looking at the testers’ video, these were full of surprises, and quite… painful to watch! Poor users!
Putting together feedback of the testers and the idea of the prime importance of positive feedback from the software, in particular in early usage phases, we designed a new release of Teamwork which we hope should be friendlier for both the first starter and the daily user. Here we document some of the differences. I hope that being this a concrete example of usability evolution, it can be of some interest for those who are working on web application usability in general.
The criteria which we used for evolution of the interface have been inspired also by Amy Jo Kim’s work from Shufflebrain who in this presentation shows how some game mechanics are used by successful social software, and this may inspire in general who is designing any kind of application:
Putting the Fun in Functional: Applying Game Mechanics to Functional Software
This is filled with interesting ideas and observations; to me what results more interesting is not so much the extrapolation of the specifics of game mechanics, but looking at ways to involve with feedback the user in its first steps in your application, and then guide the evolution of it. It is clear from the speech and Q&A part of the video that she has a wide usage and behavior culture which is only partly expressed there.
Limits of game techniques
Looking at human beings as reacting to behavioral stimuli is taking an extremely partial view, which has little explanational mileage, but not zero.
It is true that games tap in primal response patterns; but that is also their limit, at least for games that use proximal metaphors (body movements) and not reasoning, collecting, quantifying. Collecting and quantifying means inserting strings and numbers; something at which Mario Bros. like interfaces are vary very bad at; like using the iPhone keyboard for a lot of data input. But collecting and quantifying is what is most important for a huge number of applications, and where the proximal metaphors simply won’t help.
In playing games, often the player is happy to use “low level” skills; in planning work, not so much. That is also why simple stimulus – response – reinforce metaphors can be effective in gaming, advertising, but not elsewhere; we are not (fortunately) always that stupid. It is surely false that the most powerful way to manipulate human behavior is to do a variable response schedule: a good argument to a responsive crowd can do better than any behavioral proximal stimulus. But that would take us far, on the failures of behaviorism (this is old stuff from the 50’s). Still, when the users of any software are in their first steps, the response patterns of the application matter a lot.
On the Business of software discussion group I’ve recently seen a discussion on a tool for visually collecting bookmarks. The developers chose to develop a desktop client before developing a browser plugin (!); this to me is a clear mistake in adoption path strategy, which does not consider the critical point of lowering the adoption path as much as possible for such a secondary tool. Seeing collecting bookmarks as a “game played in the browser”, makes it immediately that the separate client idea is disastrous!
My point of this section is just that the gaming metaphors can help, but in limited forms and cases.
Examples
The task given to the testers was this:
- enroll to demo
- create a project
- assign yourself to it
- create a resource
- assign it to the project
- create a child task
- create some issues
- register some worklog
- search for a task
- create a to-do
Going through this, they met some difficulties, which we tried to overcome, and we document all this in this PDF:
TeamworkUsabilityExamples
(1.5 MB – lots of screen shots).
Some ideas in the PDF can be generalized; additional “behavioral reinforcement” tricks which we put in place:
- Whatever first tests the user does, he makes a % increment
- the “user score” (which was already there) has been structured in “badges” (which in our case are balloons of different color)
- operators are associated to a “color”: so say sticky notes coming from them are immediately distinguishable
N.B. The changes to which we refer are not released yet (May 13th, 2009); the demo and the downloadable version are those before changes, the new release (Teamwork 4.2) will be available in a couple of weeks.
Additional references
The World’s Largest MMORPG: You’re Playing it Right Now
Teamwork weekly news: in Russian, in French and friendlier

Teamwork's user interface in Russian.
We are currently intensely working on release 4.2, which will be a free upgrade as usual. Some of the new features that will be included are
- translation in French
- in Russian (!, thank you Kostantine),
- maybe also Chinese,
- a new start page,
- a new feedback messaging system,
- an empowered meeting management.
In the meantime we also refined our Tomcat configurations on our hosting farm, to make it even faster.

New feedback on save.

New feedback on error.

New option to pick personal color.
Leave a Comment